JUHA MENTULA OY
  • Yritys
  • Historia
  • Työkohteet
  • Yhteystiedot
  • In English
  • Teboil Taavetti

Earthwork
  • Installation of public utility networks, sewerage systems, underground drains, rain water drainage systems, and water pipelines
  • Earthwork and excavation work
  • Installation of earth heat pipes to water basins or soil depending on the location
  • Foundation work for buildings and yards
  • Demolition of buildings
  • Installation of cables in the soil, water, and air
  • Line construction
  • Long-reach excavation
  • Gravel deliveries
Water engineering
  • Dredging with a Watermaster: lakes, rivers, beaches, etc
  • Water construction: channels
  • Pontoon excavator work
  • Complete scoop and pumping equipment
  • Raft and barge equipment with a 50 tonne long-reach excavator
  • Raft and barge equipment with a 20 tonne long-reach excavator
  • A self-propelled barge, 150 cubic metres
  • Two new self-propelled barges: cargo volume 30 cubic metres each
  • 13 and 20 metre tugs for the pulling of the barges and rafts
Underpasses beneath roads and similar, horizontal directional drilling
  • Guided directional drilling of underpasses: plastic pipe, steel pipe, 32mm-1200mm
Equipment hire
  • Soil compaction equipment, mechanical vibrators, concrete mixers, drills, etc.
Machining and fuel sales
  • Lathe work
  • Welding and machining work and equipment
  • Fuels
  • Lubricants
Work at the construction site of the Mönni bridge
Work at the construction site of the Mönni bridge
Work at the construction site of the Mönni bridge
Work at the construction site of the Mönni bridge
Foundation of the terrace of Lappeenrannan Kasino
Foundation of the terrace of Lappeenrannan Kasino
Dredging of the Saimaa Canal, fixing slippages
Dredging of the Saimaa Canal, fixing slippages
Dredging of the Saimaa Canal, fixing slippages
Dredging of the Saimaa Canal, fixing slippages
Installation of a transfer sewer, Siltakylä / Pyhtää
Installation of a transfer sewer, Siltakylä / Pyhtää
Drilling of an earth heat pipe, Ruokolahti
Drilling of an earth heat pipe, Ruokolahti
A guided directional drilling of an underpass, Mikkeli
A guided directional drilling of an underpass, Mikkeli
An underpass with a plastic pipe, 160 mm, Hamina
An underpass with a plastic pipe, 160 mm, Hamina
A pontoon excavator
A pontoon excavator
An underpass with a steel pipe, 1000 mm, Lahti
An underpass with a steel pipe, 1000 mm, Lahti
Machinery,
Machinery, "Watermaster".
Machinery,
Machinery, "Otto"
Construction site practices

At each construction site, an operational plan will be prepared with the following information:
• the tasks of the subcontractor and the responsible persons appointed by them
• the contracted companies and means of ensuring their reliability
• procurements and their storage at the construction site
• equipment management
• a work safety plan.

If required, we can also prepare:
• a safety plan
• a general plan on the excavation
and blasting work
• a utilization plan of the area
• a traffic control plan.
Contact information
Address:
Teollisuustie 12, FI-54500 Taavetti, Luumäki

​Telephone:
+358(0)5 417 1660 Workshop
+358 (0)400 251 492 Juha Mentula
+358 (0)400 757 081 Mika Mentula

Email:
juha.mentula@mentula.fi
mika.mentula@mentula.fi
Juha Mentula Ky
• Luumäki, Taavetti, South Karelia, Finland •

Earthwork
Water engineering
Horizontal directional drilling
Machining
Equipment hire
Maansiirtoyritys Juha Mentula OY • Luumäki • Taavetti • Etelä-Karjala • Toimialue Suomi • (05) 417 1660
  • Yritys
  • Historia
  • Työkohteet
  • Yhteystiedot
  • In English
  • Teboil Taavetti